CryptoUniverse Cloud Miners

Information

START MINING

Current capacity of our datacentre is 20+ MW

Construction of a new datacentre is underway on our own land in the very heart of Siberia. Total area of the facility will be 8000 square meters. Total capacity of the new datacentre – 60 MW

Among the lowest electricity costs in the world — thanks to exclusive contracts with some of the world's major electricity producers

An automated industrial triple-ventilation system with cyclical polymer filters is in use in all of our datacentres. This system provides optimal conditions for the equipment and its use — sufficient cooling, air filtration and automatic humidity regulation.

We have over 7000+ miners in use at our datacentre, including the ASIC Bitmain AntMiner S9, AntMiner S11, AntMiner S15 and L3+.

START MINING

Category: Normal stability | Added by: boss (06.11.2019)
Views: 272 | Comments: 1 | Rating: 5.0/1
Total comments: 1
0
1 boss   [Entry]
Bought a contract for 1 TH / s, not at all expensive 12.99 USD.

By their own malice, they paid only a couple of days for electricity. As a result, it turned out 5 days without mining (




After payment of 2 days for electricity, the balance is not happy at all)



Good luck to all!!
Write your reviews, express your opinion !!!

Name *:
Email *:
Code *: